How we work
A defined process, from consultation to handoff
Every project follows the same ten stages. You always know what has been agreed, what is being installed, and what happens next.
- 1
Consultation
We meet your team, walk the building where possible, and document goals, constraints, and existing equipment.
- 2
Design
We produce a system design covering network, displays, audio, cameras, and software so every part fits together.
- 3
Quote
A clear, itemized quote for hardware, labour, and configuration with no hidden line items.
- 4
Sourcing
We procure the specified equipment, confirming availability, warranty, and lead times before work begins.
- 5
Installation
Mounting, cabling, racking, and physical installation carried out around your prayer and class schedule.
- 6
Configuration
Devices, networks, servers, and software are configured, secured, labelled, and documented.
- 7
Integration
Systems are connected to each other and to OpenMasjid Solutions so the whole stack behaves as one platform.
- 8
Testing
We test each subsystem under real conditions, including peak Jumu'ah load, before sign-off.
- 9
Training
Hands-on training for the volunteers and staff who will operate the system day to day.
- 10
Handoff
You receive documentation, credentials, labelled diagrams, and a clear support path.
Start at step one
The consultation is free of obligation and shapes everything that follows.
Request a Consultation